Techub News News, @elonmusk tweeted, saying,SpaceX has built a power plant exceeding 1 a gigawatt, completed in about a year, whereas it usually takes about five years. He said he tours the site up to five times a day and takes part in pulling cables, laying fiber, wiring, and power plant software work; the tweet also said,SpaceX leading in the computing power race is related to this.
All information provided on this website is for reference only.
This website does not guarantee the accuracy, validity, timeliness, or completeness of the information.
Any actions taken based on the information provided by this website are at the user's own risk.
Techub News News, @elonmusk tweeted, saying,SpaceX has built a power plant exceeding 1 a gigawatt, completed in about a year, whereas it usually takes about five years. He said he tours the site up to five times a day and takes part in pulling cables, laying fiber, wiring, and power plant software work; the tweet also said,SpaceX leading in the computing power race is related to this.
如您认为本页面(或本平台)内容存在侵权或违规情形,请您在发现之日起尽快与我们联系,并提供:权利人姓名/名称及联系方式、被侵权作品名称及权属证明、具体侵权链接及情况说明。我们在核实后将及时处理相关内容。
联系方式:creator@techub.news
商务合作:contacting@techub.news
点击链接下载 Techub News App,获取最新讯息:
https://www.techub.news/download
(或扫描下方二维码下载)

All information provided on this website is for reference only. The website does not guarantee the accuracy, validity, timeliness, or completeness of the information. Any actions based on the information provided are at the user’s own risk.
如您认为本页面(或本平台)内容存在侵权或违规情形,请您在发现之日起尽快与我们联系,并提供:权利人姓名/名称及联系方式、被侵权作品名称及权属证明、具体侵权链接及情况说明。我们在核实后将及时处理相关内容。
联系方式:creator@techub.news
商务合作:contacting@techub.news
点击链接下载 Techub News App,获取最新讯息:
https://www.techub.news/download
(或扫描下方二维码下载)

AI Coding agents completed less than 10% of tasks